Schedule for Painting: Follow to Get a Perfect Paint Job of your House

image
image

Painting your house serves two purposes, one being aesthetics and second is protection against weather. It gives the sense of completion and newness to the house. You can have all the beautiful furniture that your heart desires, but without a good paint job, the room won’t look as appealing as it could. For example, CLMcDaid painters will ask for your opinion and then arrange all the necessary equipment to paint the room as you have envisioned it. This allows you to be in control of what’s happening within your home during the remodeling. Paint provides protection to the house from sunlight, moisture, heat and other environmental factors. There are different types of paints available in the market for decorating your house such as oil paint, emulsion paint, distemper, cement paint, bituminous paint and many more. Each type of paint has its own characteristics and is used to achieve different surface finish and aesthetics.
In construction, the most common surfaces that are painted are new concrete, masonry surface or plastered surfaces. If you are going to paint newly concrete, masonry or plastered surfaces, you should know the different types of coats to be applied along with pre-treatments where necessary for corresponding types of paint. Here we give you schedule for painting interior as well as exterior surfaces, which will provide an idea of different types of coats to be used on different surfaces.

Schedule for Painting

Image Courtesy – Lowellsun, Nctodo, Naece-conf

The paint is applied in various coats or layers, to get the perfect finish. There are different types of coats such as base coat, primer coat, undercoat, finishing coat, etc. Before you understand the schedule for painting, you should know the primary difference between the primer coat and undercoat.
The primer coat is a layer of a paint that is first applied directly to the bare surface. The finishing coats are dependent on the primer coat. The primer coat is used to seal, bond and provide a strong foundation on to which finishing coat is applied. Primer coat increases the covering capacity, increases life and thus reduces the “cost of painting”.
The undercoat is also a type of primer that is applied to fill in depressions and make the surface even, to hide underlying dark colours, to prevent moisture from seeping into the material and provide a smooth, uniform surface for the finishing coat.
If you are going to a paint new surface, use a primer if you paint an existing surface that has been painted before, use an undercoat. In short, an undercoat is always a primer, but primer is not always an undercoat.

Time for the First Coat

In the case of a new building, it is not advisable to paint unless all the walls and plaster have dried completely. Ideally, paint should be applied after one year. Temporarily you may do whitewash or distemper paint.

Time between Two Successive Coats

Time between two successive coats depends on the type of paint and the surface over which it is to be applied. However always allow the coat to dry. Ideally, after application, the coat should be allowed to dry for 24 hours. However, for certain types of paint, you may apply the next coat after 6 to 12 hours also.

Schedule for Painting

A perfect paint job of your house can be done if the painting exercise is well planned taking various factors like rain, weddings, occasions, etc. in the considerations. Preparation of the surface which is to be painted must be done correctly, before starting the actual paint job. If any defect is found on the surface which is to be painted, it must be corrected such as filling of cracks, refinishing the surface or plaster for a smooth finish of the paint, etc.
For different types of finishing coats, different undercoat or primer coat has to be done. Here we have given the schedule for painting of interior as well as exterior surfaces. One should follow the schedule to get the perfect paint job.

Schedule for Painting Interior Concrete, Masonry, and Plastered Surfaces

SR. NO.FINAL FINISH REQUIREDPRIMER COATUNDER COATFINISHING COATS
01.WhitewashOne Coat of WhitewashWhitewash
(Two Coats)
02.Colour WashOne Coat of Colour WashColour Wash
(Two Coats)
 03.Dry Distemper One Clear Coat or Size, etc.Filler to be Used, if RequiredDry Distemper
(Two Coats)
 04.Oil-bound Distemper One Coat of Alkali Resistant PrimerFiller to be Used, if RequiredOil-bound Distemper
(Two Coats)
 05. Emulsion PaintOne Coat of Emulsion PaintFiller to be Used, if RequiredEmulsion Paint
(Two Coats)
 06.Flat/Semi-gloss Paint One Coat of Alkali Resistant PrimerUnder Coat as Required. Filler to be Used, if RequiredFlat/Semi-gloss Paint
(Two Coats)
 07. Gloss Paint One Coat of Alkali Resistant Primer Under Coat as Required. Filler to be Used, if RequiredGloss Paint
(Two Coats)
 08.Chemical Resistant PaintOne Coat of the PaintFiller to be used, if requiredChemical Resistant Paint
(Two Coats)
09.Cement PaintOne Coat of Cement PaintNilCement Paint
(Two Coats)
10.Bituminous PaintOne Coat of the PaintNilBituminous Paint
(Two Coats)

Schedule for Painting Exterior Concrete, Masonry, & Plastered Surfaces

SR. NO.

FINAL FINISH REQUIRED

PRIMER COAT

UNDER COAT

FINISHING COATS

01.WhitewashOne Coat of whitewashWhitewash
(Two Coats)
02.Colour WashOne Coat of Colour WashColour Wash
(Two Coats)
 03.Emulsion PaintOne Coat of Emulsion PaintFiller to be Used, if RequiredEmulsion Paint
(Two Coats)
 04.Flat/Semi-gloss Paint One Coat of Alkali Resistant PrimerUnder Coat as RequiredFlat/Semi-gloss Paint
(Two Coats)
 05. Gloss PaintOne Coat of Alkali Resistant PrimerUnder Coat as RequiredGloss Paint
(Two Coats)
 06.Chemical Resistant Paint One Coat of the PaintFiller to be Used, if RequiredChemical Resistant Paint
(Two Coats)
 07. Cement PaintOne Coat of Cement PaintNilCement Paint
(Two Coats)
 08.Bituminous PaintOne Coat of the PaintNilBituminous Paint
(Two Coats)

For a paint job sometimes, an undercoat layer is not required, but the primer coat is essential. Primer coat makes the bond with the subsurface as well as the finishing coat. It helps in hiding imperfects and provides a smooth layer for the finishing coat. The schedule for painting shown above is with reference to Indian Standards.

Also Read:
12 Qualities or Characteristics of Ideal Paint: Know Before Painting
Different Types of Primer Paint
Steps to Check for a Quality Paint Job

Do you have query?

Let our experts solve it for you while you rest

image
image
I need help to